Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Mar 09, 2022     Throttle quadrant; Flap switch - (2.3 hours)       Category: Controls
Two big successes today:

1. With the help of a dab of Gorilla glue that dried for 21 hours, an X-Acto knife, and some small screwdrivers, I managed to spread the cotter pin on the throttle arm. Then I checked all the other connections in the quadrant, and pronounced them satisfactory. I am done with that major project!

(The first photo below is the pile of tools I used to install the throttle quadrant!)

2. After last night's aborted attempts to get the flap switch panel installed, it finally succumbed to my efforts and slid into position. I installed the final low-profile black Allen-head screws, and gave it a test run. I must say that the position of this switch is absolutely perfect. You can reach it very easily, regardless of the position of the throttle, and it's actually super-convenient to use without looking or fumbling for it. It's actually better than I ever hoped!


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.